Baku News

Azerbaijan oil&gas and more

 Gazprom   RusEnergy   Azerbaijan   World   Pipeliners  Zee Beam 








Wednesday, January 25, 2006

BTC-pumped oil to reach Ceyhan terminal in March

January 2006 - Today.Az - The oil pumped to the Baku-Tbilisi-Ceyhan pipeline at the Sangachal terminal will reach the Turkish port Ceyhan in March, Azerbaijan International Operating Company said. Official opening of the Turkish part of the pipeline and Ceyhan terminal will be held after the oil reached the terminal and filled in the tanker, AzerTAj reports. Currently production tests are underway in Ceyhan terminal to make it completely ready the receive oil. The 1768 km long pipeline connecting Sangachal terminal in Azerbaijan and the Turkish Mediterranean port Ceyhan needs some 10-mln barrel oil to be completely filled.

Contact me:  

eXTReMe Tracker This page is powered
by Blogger. Isn't yours?